Projek DS Najib Yang Pembangkang Takut Dan Benci! #KekalNajib

Posted by Kerah Lekung on Thursday, 25 January 2018

Projek DS Najib Yang Pembangkang Takut Dan Benci! #KekalNajib.

Projek Datuk Seri Najib Razak yang sempat disenaraikan.

1. Menara TRX - On the way

2. Bandar Malaysia - on the way

3. 1 Malaysia - dah on Since 2010 until now

4. ECRL - On the way

5. KVDT - On the way

6. HSR - On The Way

7. Pocket park - di KL dah mula banyak dan on the way

8. Menara PNB 118 - On The Way

9. TBS - siap dan beroperasi since 2013

10. KTM Skypark - hujung or pertngahan tahun ini siap dan beroperasi

11. Keretapi Sabah - on the way

12. Pan Borneo highway - fasa 1 hampir siap

13. Bantuan warga Borneo - aktif

14. Bantuan warga Bumiputra - aktif

15. KTM Komuter - siap update dan ada still on the way

16. LRT 1 - siap sepenuhnya since 2015 / 2016

17. LRT 2 - siap sepenuhnya since 2015 / 2016

18. MRT 1 - siap sepenuhnya dan beroperasi since Julai 2017

19. BRT - siap since 2015, BRT lembah klang dalam perancangan

20. LRT 3 - on the way

21. MRT 2- on the way

22. MRT 3 - dalam perancangan / on the way

23. Monorel Putrajaya - dalam perancangan

24. Monorel KL - masih dalam proses update

25. UTC - dah siap since 2011 dianggarkan ada hampir 25 UTC seluruh negara.

26. KLIA 2 - siap since 2013

27. River Of Life - fasa 1 dah nak siap

28. Plaza Rakyat - on the way

29. BR1M -awal tahun ni korang dapat, insyaAllah (dah update belum?)

30. Intergrated KL - Dah siap since 2011

31. TRX - on the way

32. EDTS - dah siap since 2010

33. Rapid Pengerang - 60% dah siap

34. Lebuhraya no toll - Ada yang dah dimansuhkan dan ada yang memang tak de toll ada lagi yang on the way.

35. Bantuan nelayan, pekebun dan peladang - aktif.

36. No kroni better country - ada, rakyat Malaysia

37. Pelaburan - Malaysia mencatatkan hampir 40 billion dalam pelaburan sama luar negara.

38. CSR - fasa 1 CSR dah siap. Di Kelantan. Selebihnya on the way.

39. Jambatan Sabah-Labuan - dalam perancangan

40. BP1M - aktif.

41. Perniagaan Online - aktif

42. MVV - on the way

43. Aeropolis - on the way

44. Greater KL - mostly dah siap namun still on the way

45. Melaka Gateaway - on the way

46. Jambatan Angkat - on the way. Almost finished

47. CCC - on the way

48. PR1MA - aktif

49. DFTZ - aktif

50. Loji Pantai 2 - almost finished

51. Klatcc- on the way

52. AAC - dalam perancangan

53. 1AZAM - aktif

54. Bandar Media - on the way

55. KBCC - on the way

56. Adam50 - aktif since 1 jan 2018

57. Konsep kreatif DS Najib (Stesen MRT) - aktif

58. Konsep kreatif DS Najib (HSR) - on the way

59. Konsep kreatif DS Najib (PNB 118) - on the way

60. Velodrom Nasional - dah siap since 2016

61. GITT - on the way

62. Stesen Janakuasa Jimah - almost finished

63. KSTP - on the way / dalam perancangan

64. Terowong Sepanggar - dah siap since 2017

65. Padang Besar Container Terminal - on the way

66. 1M4U - aktif

67. Perlis Inland Port - on the way

68. Chuping Industrial Valley - on the way

69. Urban Malaysia - on the way

70. Rawang Bypass - dah siap since 2017

71. Green Tech Project - on the way/dalam perancangan

72. Teksi - siap update

73. Bus - siap update

74. NKRA - aktif

75. Expo Negaraku - aktif tapi closed down in 15 november 2017 sebab dah habis expo. Duhh

76. Pengangkutan update- siap

77. Lebuhraya Pantai Barat - on the way

78. Bandar Belia - on the way / dalam perancangan

79. Kem Sendayan - on the way

80. Jambatan pengguna jalan kaki - siap dan dikatakan akan ditambah lagi

81. RT1M - sudah siap di Bukit Jalil. Lain dalam perancangan

82. Pembangunan Luar Bandar - on the way

83. RTS - on the way

84. Komuter KTM Utara - sudah siap since 2016

85. Klinik 1 Malaysia - dah ada hampir 350 klinik 1 Malaysia di seluruh Malaysia

86. Tube Malaysia - aktif

87. SL1M - aktif

88. EDTP Gemas - on the way

So far, belum ada lagi projek yang bankrup atau bailout.

Sumber: Halim Abdul Dawson

Sumber asal: Projek DS Najib Yang Pembangkang Takut Dan Benci! #KekalNajib